ANALISIS RISIKO MANAJEMEN DAN PELAKSANAAN PADA PROYEK PENINGKATAN JARINGAN IRIGASI BENDUNG CARINGIN CISOLOK

Authors

  • Randi Rustandi Randi a:1:{s:5:"en_US";s:12:"Teknik Sipil";}

DOI:

https://doi.org/10.37150/jsts.v3i1.1478

Abstract

The implementation of improving the irrigation network of the Caringin Cisolok Dam in Sukabumi Regency has a very complex level of implementation risk, because this weir has been built since 2016 and the construction was not continued due to the high level of risk faced during the implementation process. This study aims to obtain risk factors that affect the cost and time during the implementation process, risk factors will be made a risk response that must be carried out in order to minimize these risk factors and to improve the quality of achieving the final results of the work. At this research stage, identification of risk factors, analysis of risk factors and mitigation of risk factors on the Caringin Cisolok Dam project, Sukabumi Regency was carried out. The analytical method that will be used is the Saverity Index method, this concept is used to determine the value of Probability and Impact. The probability and impact values ​​will be combined to produce the relevant risk variables. The collected data will be analyzed in the following stages: Risk identification, risk factor assessment and risk response. The results of this study indicate that the risk factor that has the greatest probability and impact is the risk factor value of evasive channel work with a risk factor value of 0.95.

Downloads

Published

2021-01-04

Issue

Section

Articles
Abstract viewed = 486 times