Efektivitas Penggunaan Metode Moving Formwork by Traveler Terhadap Biaya dan Waktu Pada Pekerjaan Slab Proyek Tol Jakarta-Cikampek II Elevated
DOI:
https://doi.org/10.37150/jsts.v3i1.1337Keywords:
FormworkAbstract
The floor plate (slab) is one of the moving formwork methods by a traveler or formwork system, where in the process of moving formwork components using a driving motor to get more effective and efficient results, cost price analysis of the implementation of the moving formwork method by a traveler is obtained from unit price analysis multiplied by the volume of work for the slab, the time duration and work productivity are obtained from the calculation of the cycle time execution time. The cost analysis of the slab on the Jakarta-Cikampek II Elevated toll road project using the moving formwork method by a traveler gets a cost-effectiveness value of 5.54% more efficient than using the usual formwork method, the total cost of slab work with the use of a moving form traveler is Rp. 2,764,000,000.00, From the duration of the implementation of the use of the moving formwork method by the traveler, it was found that the effectiveness of the time was 9 days faster than the usual formwork method.